 |
On March 20, 2008, SACOG's Board of Directors approved the Draft Final Metropolitan Transportation Plan for 2035 (MTP2035) after more than two years of extensive public input. The corresponding Environmental Impact Report (both Draft and Final) and Air Quality Conformity Determination are also available for review. In addition, the full press release is available.
These documents are available on CD at no cost or printed at-cost. To request a CD or purchase a hardcopy, please call 916-321-9000 or email mhernandez@sacog.org.
A formatted Final MTP2035 is expected to be completed by June 2008.
The public comment period for the Draft MTP2035 and Draft EIR expired on December 20, and public comments received during that time are now available for review.
Transportation planners are working on a comprehensive plan for the region after broad public input from nearly 8,000 area residents at community meetings and workshops since 2005, region-wide surveys and focus groups, and direct feedback.
MTP2035 will invest $42 billion in the region's transportation system, proactively linking land use, air quality and transportation needs.
|

Frequently Asked Questions
Learn the answers to questions most often asked about the MTP2035.
The Dialogue Continues
The report "MTP Dialogue Continues: Community Involvement Phases III & IV" is now available in both electronic and print versions. This report outlines the community input SACOG received during Phases III & IV of the MTP Process. This includes the results from the TALL Order regional forum a, the KCRA 3 Roadmap to the Future electronic town hall, and public opinion research conducted on SACOG's behalf.
A PDF version of the 48-page report is available in the Media Center, or you may request a printed copy by contacting SACOG at 916-321-9000.
TDM Strategic Plan
SACOG has released the TDM Strategic Plan, which can be downloaded here.
|
| Technical Forecasts and Modeling |
| Public Education and Outreach |
| Elected Officials Workshop |
Community Workshops and Stakeholder Meetings |
| Projects from MTP Workshops |
| Technical Analysis |
| Projects Combined into Alternatives |
| Regional TALL Order Forum |
| Continuing Analysis |
| Projects Recombined into Draft Preferred Alternative |
| MTP Board Input and Public Outreach (Surveys, Polls, and TV Town Hall) |
Final Analysis of MTP Projects (Budget, Timing, Performance) |
| Draft MTP Project List |
| Public Participation Plan |
| Public Comment Period |
Prepare and Release Final Draft MTP and Draft EIR |
Public Comment Period and Public Hearing |
| MTP Adoption by Board |
Gold Background = current stage
|
 |